Saturday, June 29, 2024

Closure to a proposed joint project deal. affected by Guido /Interport case

Every generation needs a revolution - an entrepreneurial revolution

I requested for a ftf meeting in a coffee shop for a closure to a proposed joint project for a 3.5 hectare project in a neighboring town.   A liaison man for the project in charge of titling and  and other legal matters reported 

at the principal is now selling instead of a jpa project.  How could they?  I have a phone number, we have accommodated them with an sizeable advance, and my sil and apo lives in the same condo cluster?

So we set at 3:30 pm in a coffee shop, but the principal was nowhere to be found -  he is sick with hibp.

There are two issues with the project:
1.   There is a conflict between him and his brother.  He wants a jp, his brother wants to sell. But without a title they cant sell.  Interport will buy from them at P1,000 to P1,500.  Very cheap compared to asking of P5,000/sm

2.  No title.  To get a title and here where it becomes confusing



     1,  Since there is not title it part of the large title of Guido estate covering 3,000+  hectares  TCT                  23777
          There are 3 supposed owners of this estate:   Guido, Rommel and Interport.  To get a free patent
           and or judicial title you need a quick claim from one or all of the above.   The lowest is P200 /sm
           and it was reported that Rommel asks for P2,000/sm driving up transaction costs.

    2.  Interport is a publicly listed company, has high caliber management and legal team.  They are not
         selling but buying

    3.  They have filed cases vs large companies like Sta Lucia, ERRDC

    In my conversation with a Chinese whose property was sold for Interport shares, he said stay
    away from that towns property because no one because of Guido case can ever get a title.  Even
    Interport Resolluces has stacks of lis pendens and documented claimants (with Tax Dec on its                  territory  and seething social unrest)

 What is our resolution with the wife of the principal:

1.  Shelve the project in the meantime, until such time that he and brother resolve differences;
2.  There is a title.

They have to pay, in the meantime penalties and renewal fee for the advances of more than half million
In the meantime, their plan is to sell.  
    would take ages, perhaps centuries to resolve

Future solutions to our vault challenges: cost and heavy weight

Every generation needs a revolution - an entrepreneurial revolution

One of the areas we are trying to solve is a step in a process that requires us to build concrete vaults that are at least 2 tons heavy and required heavy lift machinery, safety protocols and  protection.   It costs us a good 4 number to build plus numerous hours to manufacture store, transport and lower for use

There are numerous solutions being proposed:

1  Same concrete vault but:
    1 . Use of wire mesh and do away with 10 mm rebars, Use of  lightweight concrete :  with chemicals foamed concrete and lahar pebbles (1/4). +  styropor sandwhich

   2.  Use of plastic virgin plastic:  Inca plastic, Quotes being awaited.

   3.  Use of vaults, using recycled plastic Stefanie will ask from Gentri
         For 2 and 3 we ask from waiver from DOH

   4   Concrete panels that are manufactured c/o  JR but are say only 2 inches thick instead of 3 inches, to be delivered as panels in bullk and numbered bolted in site at the excavation to do away with vault hauler.  We need more skilled  workers. 





Waste to energy plants - solution to ever increasing garbage volumes

Every generation needs a revolution - an entrepreneurial revolution

Many municipalities are running out of landfills, Very soon we would exporting our solid waste,  The summer capital of the Philippines too has this problem.   The landfills pose many of the problems that are being posed by landfills:   foul odor, leaching, slow decomposition;   effect on air and water pollution.

However high temp burning, thermal facilities can vaporize waste and even convert part of the heat energy into electricity,  Many European municipalities are opting for this solution.

Now if this technology can be perfected and sold to municipality:   1.  thermal plants cum sorting and recycling.  2.  Thermal plants cum sorting, recycling and power gen